S/N End User Project Name Brief Description of Work & Quantities Year
1 Sumail Water Distribution Network 1600A LV MCC Panels – 1 No. with 75kW Softstarters – 2Nos.

400A LV  MCC Panel – 1 No. with 37kW Softstarters – 2Nos.

2015
2 Water Supply Scheme to Yeti, Al Husn and Al Bandar  – Barr Al Jissah 1250A LV MCC Panels withdrawable type – 1 No.

SMDB’s, Feeder Pillar, Lighting DB’s, ACDB’s…etc  – 6Nos.

2016
3 GPO-15-1067

Farha Expansion- 2nd & 3rd Train -MR-PSD-15-524

Main Distribution Board (6000A BUS) &

1600A MCC (Draw out type)

2016
4 Power Distribution Boards,

Junction Boxes & Control Terminal Boxes

2016
5 Upgradation of Packing System 400A LV  Intelligent MCC with PLC Panels 2016
6 Lift Stations

CCC – B5 Project

(On Going)

2Nos. 250A LV MCC Panels 2017
7 LV MCC Switchgear Panel-JOGS160703-E-DSH-E6010

Jord Oil & Gas Systems

(On going)

4000A MCC Panel 2017
8 GPO-17-0021

LV Main Distribution Panel for SHF EPF-MR-PSD-17-003

(On going)

3200A Main Distribution Board With 3 Nos. 2500A Incomers & 46 Nos. Out Going Feeders With Drawable Type 2017
9 Dahreez Pumping station  C-197

PS-3 & VIP

Junction Boxes 2017
10 GPO-16-0782-MR-OP-16-455 MAIN DB FOR FARHA OLD CAMP 1600A Main Distribution Board 2017
11 Replacement of MDB at Golden Tulip 1600A LV MDB Form IV Type

Construction of LV Room

2017
12 APS-20/5 & 11/4 Area

Salalah

200A & 250A LV MCC Panels 2017
13 Dahreez Pumping station  C-197

PS-3 & VIP

125A & 400A LV Intelligent MCC Panels with PLC

 

2017
14 RO Plant Control System 400A Intelligent Motor Control Centre with PLC & VFD (Form 2 Panel) 2017
15 ER-45 Line 630A Intelligent Motor Control Centre Drawout System with Simocode Motor Management Relays 2017
16 Qurrayat Water Distribution Network

 

2500A LV MCC Panels, APFC Panels, SMDBs 2017